Back to the land...
This year we haul out 10 tons of trash from an old burned down home. We plant a large garden, and fruit trees, and build a compost bin specifically for humanure. We build a small pad for a gazebo up under the oaks, and begin building our house/barn, with grading, a stone foundation, a concrete stem wall, and the modified post and beam frame. Everything is done by hand. We also dig four thirty foot swales across the top of the clearing and plant the berms with blueberry. A lot of work, and a lot more to go . . .
I'll also cover the process of picking out a piece of land, the negotiation, and "where to begin?" phase, at least how it all went for us.
[YEAR 2] - We build the shell of a 16'x25' two story cabin from scratch . . . check out how it was built.
[YEAR 3] - We try to finish the cabin . . .
[YEAR 4] - I move up permanently to the property to homestead full-time . . .
Sunday, November 20, 2011
11/20
Nearly 60 degrees this morning. The forecast is for 3 days of thunderstorms with temperatures up into the 70's - barely below 60 at night. Then a long spell of cold. The last couple days have been moderately warm but very windy. Today the air is still.
We worked on fencing and mulching more perennials yesterday. The jujubes, persimmons, bush cherries, and goumis are now done. The little mulberry up by the coop got a tomato cage surrounded in chicken wire. So did the sassafras I'm trying to let grow off the path to the coop [beautiful understory trees with edible leaves]. I've got maybe half the property mowed so far.
The large mulberry and cornelian cherries will become part of the fenced-in cow pasture downhill from the barn - so they don't need protected immediately. All the small perennials down from the barn along the berm made from soil dug up behind the barn - hawthorns, juneberries, currents, a medlar - they didn't do very well last year and will all be transplanted. Either they didn't get enough sun, were too wet, or constantly fighting the tide of blackberry rising behind them . . . they will all be transplanted to what will become the fence line for the pasture from the barn to the oak by the fireplace to the stump by the blueberries. We'll wait till they're all completely dormant to transplant.
All of the blueberries still need protected from deer - fencing would be too expensive. There are about 40 blueberry shrubs. We're going to try throwing bird netting over them. If branches poke through everywhere, or the netting doesn't stay in place, we'll find a way to cage it or stake it down.
We cut and split another round of firewood today up past the upper blueberries. I also cleared some of the saplings and brush in the area where we were working because it was choked with growth. There was a large dead tree fallen a couple of feet off the ground - one end up on a log, the other wedged between a couple of trees. It looked like good wood so I had to figure out a way to bring it down and start cutting it up.
They call it bucking with the chainsaw when you're cutting logs laying horizontally - underbucking is where you cut from below. I made an underbuck cut about 1/4 of the way in, heard the tension break, then from above cut a large wedge with the saw so when the log caved the saw didn't get pinched.
It worked well - just like in framing, where a rafter or joist is in tension on the bottom, and compression along the top, once the area in tension is cut along the bottom of the log, like snipping a cord, it's just a matter of cutting out an area on the upper surface so either ends of the log can fall to the ground. A wedge cut keeps the logs from pinching the saw as they go down.
The garden has had a lot of frost damage from that 20 degree night. But it's still going. Hopefully once the low tunnels are in many plants will recover. I'm going to try bending 1/2" metal conduit for the hoops - I'll use plastic conduit over the bed to get the right size hoop, trace a template of it on OSB, cut this out and lay it on the ground, driving 3/8" rebar stakes every 18" along the arch. The first 2 stakes will have matching stakes 1/2" away from them, so I have a place for the metal conduit to get lodged as I slowly bend it around the rest of the stakes and arch. Though I'd prefer to use 1/2 rebar for the stakes, I don't think it will fit inside the tube of 1/2" conduit.
After a good bit of research on using caution tape to keep out deer, we're going to start with 2 runs of it at 2.5' and 5'. If it appears deer are leaping it, we'll do another run at 7.5'. It's more of a psychological barrier as the tape hums and whips and snaps, than an actual physical barrier. We've got 3,000 feet of tape, we'll see how far that goes.
.
Blog Index
BUYING RAW LAND
11/8/08
TRASH CLEANUP
11/10/08
WINTER IN ATLANTA
11/12/08
SPRING IN TENNESSEE
11/14/08
STARTING A GARDEN
11/15/08
BUILDING THE COMPOST BIN
11/15/08
THE FROST
11/16/08
GRADING THE BARN
11/18/08
DIGGING SWALES
11/19/08
PLANTING FRUIT TREES
11/19/08
BUILDING A STONE FOUNDATION
11/20/08
THE CONCRETE STEM WALL
11/21/08
BUILDING A SMALL 12'x12' PAD
11/21/08
THE GARDEN
11/22/08
BUILDING A DRIVEWAY
11/23/08
INSTALLING THE SILL PLATES
11/23/08
THE MODIFIED POST AND BEAM FRAME
11/27/08
FRUIT IN THE GARDEN
11/28/08
THE BARN FRAME
11/29/08
AUGUST IN TENNESSEE
11/30/08
HANGING THE JOISTS
11/30/08
CLEARING THE LAND
11/30/08
COUNTRY NEIGHBORS
11/30/08
THE HARVEST
12/1/08
PLANS FOR A CABIN
12/14/08
THE LAND IN WINTER
12/22/08
BARN UPDATE
12/29/08
WINTER PLANTING
1/4/09
EDIBLE PLANTS
1/10/09
WINTER TREES
1/12/09
WINTER TREES II
1/21/09
CHATTAHOOCHEE RIVER
2/11/09
THE STRAW BALE CABIN
3/26/09
THE STRAW BALE CABIN II
4/2/09
1880 FARMHOUSE
5/6/09
HOMESTEADING / THE CABIN
8/13/09
THE POST AND BEAM CABIN
8/22/09
RETURN TO TENNESSEE
8/25/09
SITE WORK
8/30/09
DIGGING THE FOOTERS
9/4/09
THE PIER FOUNDATION
9/10/09
911
9/11/09
FINISHING THE PIER FOUNDATION
9/12/09
THE GIRDERS
9/13/09
FRAMING THE FLOOR
9/16/09
DECKING THE FLOOR
9/17/09
THE POST AND BEAM FRAME
9/19/09
THE RAFTERS
9/20/09
INSTALLING THE METAL ROOF
9/21/09
FRAMING THE WALLS
9/26/09
DOORS AND WINDOWS
9/27/09
TENNESSEE IN JULY - OUR LAST MONTH
10/2/09
TENNESSEE IN OCTOBER
10/10/09
THE BARN FLOOR
10/15/09
PIGEON MOUNTAIN
11/10/09
NOVEMBER
11/16/09
PERMACULTURE: ANOTHER ROUND OF FRUITING SHRUBS
11/22/09
DRIFTERS
11/30/09
THE BARN ROOF BEGINS
12/20/09
'DRIFTERS' PART I
12/30/09
WEATHER
1/1/10
NEW YEAR'S IN TENNESSEE
1/25/10
DRIFTERS: PART II
3/2/10
MY SISTER'S WEDDING
3/21/10
FERTILIZING WITH HUMANURE
3/28/10
THE ADDITION FLOOR
4/19/10
THE ADDITION
5/11/10
RUNAWAY
6/13/10
FINISHING THE ADDITION
.........................The Timeline.........................
1992
-MAY . . . for Patty and I's first date, we skip school and go to the Pinnacle - a wooded overlook off the Susquehanna River.
-SEPTEMBER . . . I leave our hometown of Lancaster, PA for college - Penn State in Reading, 45 minutes away.
1993
-FEBRUARY . . . Patty and I both drop out of school, and camp in some woods behind a grocery store in Lancaster.
-MARCH . . . Patty steals her mother's credit card, and with it we take a train to Utah. We ultimately end up on the Northwest Coast, living in Port Orford, Oregon.
-APRIL - OCTOBER . . . We join a traveling carnival and work in it for 6 months. We sleep in the back of a Ryder truck, and go through California, Idaho, Washington and Oregon. I run the guns, and Patty does the goldfish. We save $9,000.
-NOVEMBER . . . We return to Lancaster and are arrested for stealing the credit card.
1995
-OCTOBER . . . We bike from Lancaster down to Charleston, South Carolina. Patty wrecks in North Carolina, and a friend drives us the rest of the way. We live in Charleston for 2 weeks.
1996
-JULY . . . Our first daughter June is born in Lancaster, PA.
1997
-MARCH . . . We sell everything in our apartment, and hike out of Lancaster with backpacks and our 9 month old daughter. We reach the Susquehanna River.
-APRIL - JUNE . . . We get a canoe and paddle 500 miles up the Susquehanna River to its source. We camp on islands. We get a ride to the Erie Barge Canal and paddle west.
-JULY . . . We are arrested in Little Falls, NY. Our daughter is taken, we're charged with neglect, and we fight the courts for months. We are cleared of all charges, but never get her back.
-SEPTEMBER . . . We take a bus out to Ruidoso, NM and camp in woods just out of town. We return to Lancaster and camp in the Brickyard for the rest of the month.
-OCTOBER - FEBRUARY . . . We live in an apartment in the Amish community of Strasburg, PA. Amish go by in their horse and buggies every day.
1998
-FEBRUARY . . . Our second daughter Rachael is born. We try to deliver her on our own at home and fail. Patty ends up in the hospital with a c-section.
-MARCH . . . We get a ride from a friend down to Covington, Virginia. We stay a week, and look for places to camp in the surrounding national forest. We find nothing, and go to New Mexico.
-MARCH - MAY . . . We camp in the Gila National Forest, north of Pinos Altos, a mile from the nearest trail. We camp above a spring with an infinite view west. We start building a hogan.
-JUNE - SEPTEMBER . . . We live downtown in Santa Fe, NM. Patty markets her paintings, and I get a N.Y. literary agent for my first book 'Flesh Aflame'.
-OCTOBER - DECEMBER . . . We rent a house in Crescent City, California, on the Northwest Coast, a mile from the ocean, on the edge of a bird sanctuary. It's great until the rains begin and we run out of money.
1999
-JANUARY - FEBRUARY . . . We camp in the Uwharrie mountains of central North Carolina, and look for a place to build a winter home.
-MARCH . . . We get a canoe and paddle the Holston River down towards Knoxville, Tennessee.
-APRIL . . . We get dropped off in the Smokies and paddle Fontana Lake. We stash our canoe at Chambers Creek and hike in to the Smokies for a secret camp. Patty paints the creek, and we stay 3 weeks.
-MAY . . . We live in a trailer just off the ocean in Myrtle Beach, SC. The sky is beautiful after storms and we love the pelicans.
-JUNE . . . We camp in the Brickyard back in Lancaster, PA, saving money for an apartment.
-JULY - DECEMBER . . . We live in Lancaster and save for our trip back out to New Mexico. We also buy the jeep.
2000
-JANUARY - JUNE . . . We camp and travel all over the Southwest, from the Gila, to Organ Pipe, to the Weminuche in Colorado. Brooke is born in February in a motel in Deming, NM.
-JULY . . . We stay in condos with a friend in Aspen, Colorado. I do concrete work. We then go to California, and look for a place to live in the Russian River area.
-AUGUST - OCTOBER . . . We rent a small house in Tesuque, NM, just outside of Santa Fe. We hike up into the Pecos Wilderness. We become vegetarians.
-NOVEMBER . . . We visit a friend in Tucson, AZ, then drive to Crescent City and the Northwest Coast. The beautiful weather is over, and the rains have begun. We don't stay long.
-DECEMBER . . . We return to Pennsylvania, and live out of our car in the Philidelphia area while Patty works at a restaurant. We sleep in parking lots and rest stops. It's the coldest December on record for the area, with the wind chill it's -10.
2001
-JANUARY . . . We head south for warmth, try the Chatooga area of South Carolina, then camp in the woods of northern Florida.
-FEBRUARY - JUNE . . . We live in Asheville, NC, in the middle of the Southern Appalachains. We spend nearly every day out on the trails, hiking, and learning plants.
-JULY . . . We get mountain bikes for touring, and bike the Blue Ridge Parkway to the Smokies.
-AUGUST . . . We camp in the Weminuche Wilderness of southwest Colorado, and do a 6 day fast.
-SEPTEMBER . . . We stay in Loveland, Colorado with a friend. We climb Long's Peak on the day after 9/11. We then drive to Vermont, and look for a place to live in the Burlington area.
-OCTOBER - DECEMBER . . . We rent a house in Tucson, AZ, and try to become raw fooders.
2002
-JANUARY . . . We hike in to Jordan Hot Springs in the Gila.
-FEBRUARY . . . We bike in to Turkey Creek Hot Springs. We stash our bikes near the mouth of the creek, and hike the rest of the way. Many of the pools have been ruined from floods.
-MARCH . . . We go to Vermont again, this time the Bennington area of southern Vermont. It's way too cold.
-APRIL - JULY . . . We rent a house in Asheville, NC again. This time we have a large garden, and become 100% raw fooders. Every day I'm out hiking the trails gathering wild edible plants.
-AUGUST . . . We cash out all our credit cards, and move up to Shining Rocks Wilderness in the Southern Appalachians, camping at over 5,000 feet. There are blueberry fields everywhere, and blackberry, and wild cherries. Not only are we mono-raw fooders now, much of our food is wild. I hike barefoot everywhere. We bathe in the pool below the falls.
-SEPTEMBER . . . We visit a friend in Atlanta, and on a night full of alcohol I break my foot in 3 places. I'm told I'll be crippled with arthritis, and ultimately never walk again.
-OCTOBER - DECEMBER . . . We rent a furnished condo in Tucson, AZ. I cut my cast off prematurely with tin snips.
2003
-JANUARY . . . We camp off the Gila River at Box Canyon, just up from the city of Gila. I'm still on crutches. We meet Jabber-Mike, and Vet-Mike, and Doug. We trade juniper berries for Doug's black walnuts. We're still 100% raw fooders, and Doug teaches me the local plants.
-FEBRUARY - MARCH . . . We return to Atlanta for free medical care so I can learn how to walk again. PT is hell.
-APRIL - MAY . . . We go back to the Gila and camp off the Gila River. We gather cattail, nettle, primrose flowers, and harvest prickly pear pads. We find the most perfect hot spring in all of the Gila, man-made, at Brock Canyon.
-JUNE . . . We fall off our raw food diet, and camp up at Black Balsam again off the Shining Rock Wilderness. We gather wild strawberries. We then camp above the Amicalola Falls in north Georgia for 2 weeks. We become committed to the idea of buying land.
-JULY - SEPTEMBER . . . We live in Woodstock, GA, just north of Atlanta. I do a 14 day water fast.
-OCTOBER . . . We paddle Fontana Lake in the Smokies, on our way to Nova Scotia. We find a great camp and gather wild persimmons, but ultimately abandon the trip.
-NOVEMBER . . . We go back to camping off the Gila River at Brock Canyon. I begin 'June'. We run totally out of money, and gather and clean 10lbs of desert willow seed to sell to a local guy in Gila. He gives us $20/lb, and we use the money to get back to Georgia.
2004
-JANUARY . . . We go to north Florida, and check out the sinks, and the aquifer springs, and paddle the Wacissa River.
-FEBRUARY . . . We paddle the Suwanee River in North Florida. Patty makes a basket out of greenbriar.
-MARCH . . . We camp in the pine flats of Apalachicola National Forest. We make baskets from grapevine, cordage from the retting of Spanish Moss, and a mat from palmetto. We camp here for 3 weeks with no money while we wait for our tax refund. We're 100% raw fooders again.
-APRIL . . . We camp off Owl Creek and paddle the river. There are free hot showers in a nearby campground. There's a great trail with wild blueberry, and we gather the new shoots of bracken. We later camp in Tate's Hell.
-MAY . . . We camp at Sand Creek in the Ocala National Forest, an hour east of Atlanta. I gather cattail in the Beaver Pond. I edit and type up the 'June' book at a nearby library for a literary agent.
-JUNE . . . We drive out to Oregon and camp off the Illinois River in the Siskiyous.
-JULY . . . We camp in the Adirondacks off Jones Pond.
-AUGUST . . . We camp in the Jemez Region of northern New Mexico. We gather wild mushrooms, and sell lobster mushrooms to chefs in Sante Fe. We camp at San Antonio Hot Springs for a week, and Big Tesuque Campground outside Sante Fe.
-SEPTEMBER . . . We go back to the Gila and camp at Brock Canyon. We gather desert willow seed again. We swim and play games in the river. We see tarantulas. I gather prickly pear fruit in baskets we've made from willow. We take a trip up to Turkey Creek Hot Springs.
-OCTOBER . . . We camp in the Oconee National Forest southeast of Atlanta, under persimmon trees in a field. We also camp up on Pigeon Mountain near Rocktown.
-NOVEMBER - JANUARY . . . We live in Atlanta.
2005
-FEBRUARY - MARCH . . . We move to Portland Oregon. We paddle the Wilamette River, and go to the nude beach at Sauvie Island, just after Mt. St. Helens erupted.
-APRIL . . . We return to north Florida looking for land to buy. Everywhere is flooded, and there's been a lot of damage from the previous hurricane.
-MAY . . . We camp up on Pigeon Mtn. The weather's perfect, and there's more wild food here than anywhere else.
-JUNE . . . We go to Arizona, and camp in the Hannigan area of Apache National Forest. We ultimately try to get back out to Oregon, but car problems make it not possible.
-JULY . . . We return to Pigeon Mtn in Georgia. The blackberries are in.
-AUGUST . . . We stay in a campground off the ocean in Jacksonville, Florida, while we look for jobs and a place to live.
-SEPTEMBER . . . We move back to Atlanta.
-OCTOBER . . . We abandon the jeep with 320,000 miles in a motel parking lot.
2006
-MARCH . . . the girls and I camp up at Pigeon Mtn, in a secret camp we've made.
-JUNE . . . the girls and I go back to Pigeon and camp longer, this time starting a wigwam from red maple saplings, muscadine vines, and grass I collect naked in the field with a small knife.
-AUGUST . . . the girls and I camp up at Graveyard Fields off the Blue Ridge Parkway. Every day we gather the wild blueberries and swim in the pool beneath the falls. We hike all the trails, and establish a secret camp in a grove of juneberries.
2007
-FEBRUARY . . . We look at property in north Florida.
-MARCH . . . We look at property in Asheville, NC.
-JUNE . . . We look at the 10 acres in Sunbright, and make an offer.
-AUGUST . . . We close on the Sunbright property, and take the kids to Disneyworld.
-OCTOBER . . . The girls and I camp up on the property in Sunbright, and clean up the trash from the fire. I build a fireplace out of old concrete blocks.
2008
-APRIL - SEPTEMBER . . . The girls and I camp up on the property. We clean out the rest of the trash, build a compost bin for humanure, plant the garden, and fruit trees, I dig the swales, do the stone foundation for the barn, and the stem wall, and the post and beam frame. We build a pad for the gazebo.
2009
-APRIL - JULY . . . The girls and I camp up on the property again. We build the 2 story cabin from scratch, plant another garden, and more fruiting trees and shrubs.
-OCTOBER . . . I put the upper story floor in the barn.
-NOVEMBER . . . The girls and I begin building the barn roof.
No comments: